One week after the footings were poured they began to form the first floor columns. With every pour they conducted a slump test and poured concrete cylinders for strength testing. They always did the tests near the crane so I had a good view. Note that the first floor walls are already being laid. It’s hard to see in this photo but the bricks are hollow. The mason never used a saw but simply used his trowel to chop the bricks to size.